RAMS & Method Statement Pack

The Contract Is There. Your Paperwork Is Costing You It.

A complete, trade-specific risk assessment and method statement — written for your business, ready to submit, and editable for every future project.

£247. PDF and Word. Delivered in 5 working days.

Get Started — £247

Sound familiar?

  • If a principal contractor called you today and asked to see your RAMS before approving you for a contract — could you send them something that would pass scrutiny?
  • Have you ever lost a commercial job because your paperwork was not up to standard?
  • How many commercial contracts are you simply not quoting for because you know the compliance documents aren't ready?

The real problem

A principal contractor asks to see your RAMS before they will let you on site. You send them something you downloaded from Google two years ago with your logo on it. They look at it for thirty seconds and tell you it does not meet their requirements. The contract goes to someone else. This happens more than it should — not because the business cannot do the work, but because the paperwork does not reflect the trade or the specific risks involved. A generic template does not demonstrate competence. It demonstrates that you have not thought about the job.

What You Get

  • Risk assessment — trade-specific

    Hazard identification and risk ratings specific to your trade activities — not generic office hazards. A specific RAMS tells a principal contractor you understand the job. A generic one tells them you downloaded something.

  • Method statement — written for your work

    Step-by-step sequence of works written around how your business actually operates. Scope, operatives, qualifications, plant and equipment, site rules.

  • Emergency arrangements section

    First aider, first aid kit, nearest hospital, fire procedure. The section most generic templates leave blank — completed with your specific details.

  • PDF — ready to submit

    Professionally formatted. Looks like a document from a business that knows what it is doing — because the difference between shortlisted and rejected is exactly that.

  • Word document — editable for every project

    Update project details and operative list for each new job. The structure stays. Every commercial quote you send from here has the paperwork ready before it is asked for.

How It Works

  1. 01

    Order and complete the intake form

    Email rob@opsdeck.co.uk with "RAMS & Method Statement Pack". Intake covers your trade, work activities, team, qualifications, PPE, and specific hazards. Takes 15–20 minutes.

  2. 02

    We write your RAMS

    Every hazard specific to your activities. Every control measure reflecting how you actually manage risk. Not a template with your name on it.

  3. 03

    You receive PDF and Word versions

    Delivered within 5 working days. PDF ready to submit. Word document yours to update for every future project.

  4. 04

    You submit with confidence

    Send the PDF to the principal contractor as part of your pre-works package.

What Makes This Different

Without OpsDeckGeneric template — same hazards for every trade
With OpsDeck
Trade-specific risk assessment — the actual hazards your operatives face
Without OpsDeckPlaceholder scope of works
With OpsDeck
Method statement written around how your jobs actually run
Without OpsDeckBlank emergency arrangements section
With OpsDeck
Completed with your specific details — first aider, hospital, muster point
Without OpsDeckNo operative sign-off page
With OpsDeck
Sign-off page included — required by most principal contractors
Without OpsDeckPDF only — cannot be updated per project
With OpsDeck
PDF and Word — update the Word version for every new project in minutes

Ready to Submit With Confidence?

£247. Trade-specific. PDF and Word. Ready to submit. 5-day delivery.

Get Started — £247

Also available as part of the Commercial Readiness Pack — RAMS, Compliance Pack, and Company Profile for £497.